Compliant design
Layouts that meet hygiene, safety and regulatory requirements.
Plant Design, Installation & Maintenance Services
BEMCON supports laboratory development for quality control, food testing, microbiology, chemistry and industrial analysis. Planning connects testing requirements and sample volumes with appropriate work areas, equipment positions, utilities and installation arrangements.

BUILT AROUND YOUR REQUIREMENT
Each engagement starts with the required outcome, operating context and evidence of success. The result is a focused Laboratory Planning, Design & Installation scope with clear responsibilities and handover points.
Layouts that meet hygiene, safety and regulatory requirements.
Material, people and waste flows planned to avoid contamination.
Supply, fabrication and installation managed end to end.
Testing, handover documentation and operator training.
8 SPECIALIST CAPABILITIES
Select the capabilities that match your Laboratory Planning, Design & Installation requirement, operating context and agreed delivery stage.
We establish planning requirements from the intended tests, expected sample volumes and equipment specifications. Workflow reviews define the relationship between sample receipt, preparation, testing, washing and storage.
We plan sample receiving, identification, temporary holding and retained-sample storage areas. Arrangements reflect sample characteristics, storage conditions and movement into the relevant preparation or testing area.
We organise preparation and testing spaces around planned laboratory activities. Layouts consider equipment access, contamination control and separation between incompatible microbiological, chemical or industrial testing operations.
We coordinate bench layouts, laboratory furniture and instrument positioning using equipment dimensions and operating requirements. Planning addresses working space, storage, service access and suitability for the intended tasks.
We define power, water, drainage and other equipment-specific utility requirements. Connection schedules identify service points and interfaces requiring coordination with equipment suppliers and building-service specialists.
We coordinate chemical storage, extraction and containment requirements around identified laboratory hazards. Planning considers the activities performed, material compatibility and the space required for appropriate specialist equipment.
We plan washing points, cleaning-equipment storage and supporting work areas around laboratory operations. Layouts address movement of used items, clean-item storage and separation from sensitive preparation or testing activities.
We coordinate installation schedules and agreed facility and equipment checks. Handover records capture operating requirements, completed inspections and outstanding actions requiring resolution before the relevant areas enter service.
HOW WE WORK
A defined workflow keeps the work aligned with the approved scope and makes progress, decisions and handover easier to manage.
Scope your requirementConfirm the site, operating needs, constraints, applicable requirements and expected handover outcome.
Coordinate the design basis, layouts, specifications, interfaces and approval points for the agreed scope.
Manage relevant fabrication, supply, installation and technical interfaces against the approved information.
Record agreed checks, outstanding actions and the information needed for operation and follow-up.
WHAT YOU RECEIVE
Documented requirements, site constraints, design criteria, responsibilities and approval points.
Relevant layouts, specifications, schedules and interface information for the agreed scope.
Recorded installation, inspection, testing or commissioning evidence appropriate to the assignment.
Outstanding actions, operating considerations and practical next steps identified for the client team.
GET IN TOUCH
Choose the type of request and share the details. The right BEMCON team will respond.